![]() | Only 14 pages are availabe for public view |
Abstract The present study covers the area in the North of El-Sharkia governorate. This area is known to be suffered from irrigation problems and the farmers always complain about irrigation issues. Irrigation networks often are seen to perform below the expectation level, requiring rehabilitation. Unfortunately, rehabilitation works are taken up on a piece-meal basis. The main object for rehabilitation is to improve conveyance efficiency, reliability and durability of the system so as to provide irrigation water to the beneficiaries in a more sustainable and equitable manner. The objectives of this study are to investigate the causes for water shortage in canals tails and perform rehabilitation for sections to improve the hydraulic performance. Questionnaires for both engineers and beneficiaries approved many reasons including need for rehabilitation behind the inefficiency of irrigation canals performance. A computer program is used to choose the best solution to achieve water balance. The CCHE-GUI 3.29 program is used to in a case study (El- Bateekh canal), which approved the inefficiency of the canal to deliver the required discharges. Rehabilitation and remodeling of the canal both improved conveyance efficiency for the same discharge. The velocity magnitudes and sedimentation (bed changes) for the sections at (0 km, 2km, 4 km. 6 km, 8 km and 8.3 km) of El-Bateekh canal are obtained numerically using the program for six cases. The rehabilitation cost of El- Bateekh canal to achieve the best cross section is done. |