Scheduling Of Preventive Maintenance Using Vibrtion:
الناشر
Mohamed Abd Alrahman Omar Abu Zaid ,
المؤلف
Abu Zaid, Mohamed Abd Al Rahman Omar
هيئة الاعداد
باحث / محمد عبدالرحمن عمر
مشرف / مصطفى زهران
مشرف / سليمان محمد سليمان
مشرف / احمد الخطيب
الموضوع
Chemical Industries
تاريخ النشر
1994 .
عدد الصفحات
138.P:
اللغة
الإنجليزية
الدرجة
ماجستير
التخصص
الهندسة الصناعية والتصنيع
تاريخ الإجازة
1/1/1994
مكان الإجازة
جامعة الاسكندريه - كلية الهندسة - انتاج
الفهرس
Only 14 pages are availabe for public view

from 123

from 123

Abstract

Systematic care and attention IS required to keep equipment in -good working order.
In any industrial enterprise a general system of planned or scheduled
preventive maintenance is used not only to keep equipment at its rated productivity and original accuracy, but also to ensure its full and uninterrupted
system.
The essence of this system is to gIve each machine or mechanism regular inspection and Various Preventive Maintenance at definite intervals
according to a schedule.
The condition Based Maintenance IS one of the recently developed
programs III maintenance.
It IS based on respective measurement III order to determine the
condition of the Machine.
The main objective of this work is to schedule the condition Based Maintenance. This objective is verified by using a mathematical model for
economic shutdown using CBM.
-
To establish the main objective, some steps have to be followed; these
are:
1- Definition the bathtub curve characteristics.
2- Formulation bathtub curve characteristics and probability.
3- Construction of the Economic shutdown Mathematical modeL
4- Definition of the variables of the modeL
5- Definition the Mathematical model constraints.
6- Calculation of the total cost of production elements in the economic shutdown modeL
The computer plays a main role to identify the research objective.
Some COBOL program were designed for CBM scheduling using
economic shutdown model.
The scheduling of CBM using Economic shutdown model was applied 111 the dyestuff and chemical company to the following Machines:-
1. Rotary screw air compressor (SSR/18L)
(code 12/13/803) (Unit A)
2. Nitrogen turbine (N2 turban)
(code 12/28/300) (Unit B)
3. Feed pump (power saturation)
(code 20/04/240) (Unit C)
4. Feed pump (water station)
(code 29/02/207) (Unit D)
5. Pesticide plant Feed pump motor
(code 14/07/210) (Unit E)
The results of CBM scheduling that can be concluded from this work
are:-
1- The relationship between the bathtub curve and the probability density function is formulated.
2- The production elements cost based on the chart of
account is formulated.
3- The Economic shutdown l’vIathematical model for
calculating the optimum shutdown time is formulated.
From the research results, the CBIVI is more economical, more safe, high
accurate, the CBM scheduling using the economic shutdown Mathematical model is
dynamic and proper for the chemical, and petroleum plants, power plants, water plants,
and any large enterprise.